Understanding the intermittent bonded ribbon production line
Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. provides equipment for producing rollable formats used in optical-fiber manufacturing. Buyers can evaluate the capacity of this setup against their intended product range because it is designed for 12- and 16-fiber ribbons. Factory space and installation needs may also be affected by the system’s split-type construction.
Fiber Secondary Coating Line Fiber Coloring Machine Fiber Draw Tower
The stated construction speed for this particular production line is 600 m/min. The process combines fiber pay-off, gathering and guiding, intermittent resin dispensing, UV-LED curing, visual monitoring, capstan pulling, and take-up. When assessing suitability, the complete process matters rather than speed alone.
Before purchasing, review factory utilities, reel requirements, available floor space, and installation conditions. Ask the supplier for its documentation package and check the system’s suitability for your cable design and operating requirements. Early planning for these details can minimize setup delays and make startup smoother.
Key Takeaways
- Intended to produce rollable 12- and 16-fiber formats.
- Listed speed: 600 m/min for this equipment.
- Uses a split-type construction.
- Curing, monitoring, pulling, and take-up stages are included.
- Check utilities, reels, installation needs, and supplier documents before buying.
Intermittent Bonded Ribbon Production Line
Examine The Intermittent Bonded Ribbon Production Line
Three mold groups help shape rollable IBR formats by positioning fibers for small adhesive dots. Operators can adjust the mold position from 0 to 15 mm to maintain consistent spacing and shape.
Produce Rollable Fiber Ribbons With Precision Bonding
A 16-spool pay-off supplies fiber to the machine, while guide rollers with U-shaped grooves keep individual strands organized. Hard-anodized roller surfaces support steady contact during processing. The adjustable valve arrangement supports 12F and 16F layouts, using 5+5+1 valves for 12 fibers or 5+5+5 for 16. Ask the supplier to confirm tension control settings that suit your particular cable design.
Run 12- And 16-Fiber Configurations At Up To 600 m/min
Construction speed is listed at up to 600 m/min. The listed reel dimensions, Φ236 mm × Φ25.4 mm × 108 mm and Φ267 mm × Φ25.4 mm × 180 mm, correspond to pay-off reel options holding 25.2 km or 50.4 km of fiber. The system also offers T-type or fiber-optic take-up reels. Assess whether reel capacity matches your operating needs and anticipated changeover time.
Examine The Production Line’s Main Equipment And Controls
Consistent output depends on coordinating tension, resin placement, and UV exposure. The system helps operators adjust settings to their cable design and fiber ribbon requirements.
Manage Fiber Tension, Resin Dispensing, And UV-LED Curing Together
Every pay-off unit uses electro-pneumatic adjustment. Through the interface, operators set adhesive-dot spacing and counts while dispensers work individually or in linked groups.
Before UV-LED post-curing, three pre-curing ovens work with the mold groups. Ask the supplier to confirm resin compatibility and the relevant operating conditions.
The Siemens PLC and touchscreen display lamp current and oven temperature, generate alarms, and support preset lengths. Check the required cabinet and power supply arrangements before purchasing.
| Stage | Technical Specification | Buyer verification |
| Fiber tension | Pay-off tension: 0.4 to 2 N with ±0.02 N; capstan tension: 50 to 500 g with ±5 g accuracy | Match settings to cable needs |
| Dispensing of resin | Individually operated or linked units with adjustable adhesive-dot spacing and count | Check interface configuration |
| Curing With UV-LED | Three pre-curing ovens rated 800 W each; one post-curing oven rated 6 kW; 395 nm ± 3 nm; at least 85% cure during stable, high-speed operation | Verify compatibility with the resin |
| Process monitoring | Siemens S7-1200 or S7-1500 PLC; 10.4-inch touchscreen; real-time lamp current and oven temperature, alarms, preset lengths | Check cabinet and power supply |
Prepare Line Configuration, Installation, And Operating Conditions
Before the machine is delivered, prepare a dedicated operating area. The optical fibre system requires an enclosed, clean, dry, and draft-free space. Maintain temperatures between 15°C and 25°C and humidity at or below 85%. These conditions help protect fiber equipment and maintain precision during operation.
Review site utilities, electrical capacity, cabinet space, and cable design with your facilities team. Nitrogen at 7 bar with 99.99% purity and compressed air at 6 bar are specified for the system. A three-phase, five-wire electrical supply rated 380 V ±10% is required.
- Reserve room for the cabinet, components, resin, and access to service parts. Before starting the line, confirm the temperature settings and tension control.
- Plan around the specified reel dimensions of Φ410 mm × Φ50.8 mm × 391 mm. The take-up unit accepts reels weighing up to 30 kg.
- Include the main power feed-in cable in your site plan. The equipment package does not include connection cables and cable trays.
Before ordering, verify the supply scope, reel types, and installation requirements. This assessment can reduce setup time and help prevent later delays. Ask the supplier to verify settings for your fiber and cable design, including lamp accuracy and operating conditions. A clear plan helps the production system begin operating more smoothly.
Request Pricing For A Ribbon Production Solution Tailored To Your Needs
At its stated speed of 600 m/min, this line can be considered by manufacturers producing rollable 12- or 16-fiber formats. Share details of your fiber layout, output targets, cable requirements, reel preferences, and factory conditions to request a quotation.
Check the proposed system for its 16-spool pay-off, UV-LED curing setup, take-up capacity, and included options. Examine the supplied components, dispensing-head options, unit functions, and cable design prior to ordering.
The documentation list covers operating and maintenance manuals, a general layout drawing, electrical schematics, and a wear-parts list. These documents can help assess setup time and ongoing service needs.
Contact Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. to request pricing and configuration details that suit your output plan and site utilities. Verify the supply scope and replacement parts before purchase.
